Section 1105. Walkway. —

  1. When the Building Official authorizes a sidewalk to be fenced or closed, or in case there is no sidewalk in front of the building site during construction or demolition, a temporary walkway of not less than 1.20 meters wide shall be provided.

  2. The walkway shall be capable of supporting a uniform live load of 650 kilograms per square meter. A durable wearing surface shall be provided throughout the construction period.